A custom kitchen schedule is a sequence of decisions and dependencies, not just a production date. Separate the initial design conversation, final measurement, approval, fabrication, delivery and installation before planning around a promised week.
LeVika's initial conversation is a project-fit review, not a separately sold general consulting service. Its purpose is to understand the proposed cabinetry work and identify what is needed for the next design step.
A 3D concept communicates intent, while the production process needs verified information and explicit approvals. Keep those stages connected without treating them as interchangeable deliverables.
Preparation should follow the agreed installation plan for your property. Ask the team what must be complete before arrival rather than assuming that an empty kitchen is automatically ready.
Field measurements connect the design to the actual room. A small difference can affect the relationship between cabinetry, openings, appliances and adjoining finishes, even when a concept looks convincing on screen.
Approve shop drawings when the information needed to manufacture the agreed cabinetry is sufficiently resolved, not merely when the rendering looks attractive. Ask LeVika to identify the actual approval package and decision owners.
A change should describe what is different, why it is needed and what effect it has on the approved project. Keep the request separate from permission to proceed until those consequences are understood.
Cabinets, counters and appliances meet at precise interfaces. A coordinated project makes the current product information available to every responsible party before each element is manufactured or installed.
Use the walkthrough to compare the installed cabinetry with the approved scope and record questions clearly. It is not a substitute for specialist inspection of electrical, plumbing, structural or other regulated work.
Closeout should leave you with an understandable project record and a clear way to ask for help. Installation is not the moment to lose the finish schedule, hardware references or outstanding-item list.